Pruf Logo

Post Analytics

Post
pubity
pubity
@pubity

Kevin O'Leary's proposed data center in Utah will require 9 Gigawatts of energy to function when fully built, double Utah's current energy usage for the entire state. It will dump around 23 atomic bombs worth of thermal load on the environment every day.

Kevin O'Leary's proposed data center in Utah will require 9 Gigawatts of energy to function when fully built, double Utah's current energy usage for the entire state.

It will dump around 23 atomic bombs worth of thermal load on the environment every day.
Kevin O'Leary's proposed data center in Utah will require 9 Gigawatts of energy to function when fully built, double Utah's current energy usage for the entire state.

It will dump around 23 atomic bombs worth of thermal load on the environment every day.
May 10, 2026 · 7.02M Views
1.42K
6.89K
26.2K
7.02M

Key Metrics

Impressions
7.02M
Likes
26.2K
Comments
1.42K
Engagement
0.390%
Saves
2.93K
Reposts
6.89K

Historical Performance

Last refreshed: 2 hours ago